Integration of welding robots at Renault, Bursa and Maubeuge

Renault · Bursa (Turkey) and Maubeuge (France) · 2017 to 2020. Two welding robot integration projects, sole ABB representative on site, from assembly to ramp-up.
June 20, 2020 by
Integration of welding robots at Renault, Bursa and Maubeuge
SITE REFERENCE

Two integration projects for welding robots

Renault · Bursa (Turkey) and Maubeuge (France) · 2017 to 2020

Welding robot integration · Sole ABB representative on site · From assembly to ramp-up

Where the CREDO story begins. Before CREDO was created, these two projects are part of the experience we brought into the new company.

From September 2017 to 2020, two welding robot integration projects at Renault. First in Bursa, Turkey, on the Clio 5 body shop: two hundred ABB robots to integrate on a site in production. Then in Maubeuge, France, the same mission renewed. Two years on site each time.

I was the sole ABB representative on site. In practice, managing the customer and the suppliers: around fifty people in the field, six to seven suppliers to coordinate, and as daily contacts the Renault industrial project leaders, one per area, the project managers and the body shop sector director.

What we did

1
Assembly
Supervision of the layout and assembly of the two hundred welding robots.
2
Commissioning
Trials, settings and validation of the installations to the manufacturer's standards.
3
Start of production
Support for the first series and clearing of reservations with ABB and Renault.
4
Ramp-up
Monitoring of the line up to nominal throughput.

The result

✓ Two projects carried from assembly to nominal throughput. ✓ A mission renewed from one site to the next. ✓ The foundation of CREDO's site method today.

In pictures

Body shop line in production, spot welding in progress.
Robotic cell seen from the walkway, welding robots in position.
Welding robots on a body shop cell.

A line project, a retrofit or a part to find: use the contact form or call +33 4 38 61 25 77.

Jérôme Gautier, Managing Director, CREDO ENGINEERING FRANCE

Integration of 50 ABB robots for the electric Renault 5
Renault and ABB France · ECHO project (electric R5) · Ampère plant, Douai (59) · 2024. Carry-over, Electrical and fluid interconnection, Body side assembly.

Our credo,
Securing your projects

One of the reasons we became an industrial integration company is that we love engineering, the technical side and adapting to different processes. Building a surface treatment plant, assembling it and keeping it running for the long haul is deeply satisfying.

Contact

ZAC du Pida, Bât 13, 250 rue de la Bièvre, 38490 Aoste

+33 (0)4 38 61 25 77

Contact
Copyright CREDO ENGINEERING FRANCE. All rights reserved.