Two integration projects for welding robots
Renault · Bursa (Turkey) and Maubeuge (France) · 2017 to 2020
Welding robot integration · Sole ABB representative on site · From assembly to ramp-up
Where the CREDO story begins. Before CREDO was created, these two projects are part of the experience we brought into the new company.
From September 2017 to 2020, two welding robot integration projects at Renault. First in Bursa, Turkey, on the Clio 5 body shop: two hundred ABB robots to integrate on a site in production. Then in Maubeuge, France, the same mission renewed. Two years on site each time.
I was the sole ABB representative on site. In practice, managing the customer and the suppliers: around fifty people in the field, six to seven suppliers to coordinate, and as daily contacts the Renault industrial project leaders, one per area, the project managers and the body shop sector director.
What we did
The result
✓ Two projects carried from assembly to nominal throughput. ✓ A mission renewed from one site to the next. ✓ The foundation of CREDO's site method today.
In pictures
A line project, a retrofit or a part to find: use the contact form or call +33 4 38 61 25 77.
Jérôme Gautier, Managing Director, CREDO ENGINEERING FRANCE